If all the elements in MPCORB.dat are NOT of the same equinox (ie I
had applied Integrat to Today - yesterday, then had Astrometrica
Update the MPCORD.dat table from the MPC dailys today then reran
Integrat, would the software read the equinox for each line and
apply what was needed or would it assume that the equinox was the
same?
Or am I barking up the wrong tree?
Cheers
David Higgins
E14
Canberra, Australia
http://users.bigpond.com/higginsdj